In addition, AISD construction management staff developed a list of immediate needs at various campuses, such as needed restroom repairs. If these items are left unattended, much more expensive remediation would be required in the long run. Additional projects needing immediate attention were submitted by principals and various districtwide departments. These projects also include items presented during the public forums.

HEALTH & SAFETY

Bailey MSConvert darkroom to ADA-compliant student restroom
Baker CenterInstall ADA-compliant elevator and create accessible exterior pathway
Barton Hills ESRenovate/expand adult restrooms
Doss ESReplace electric drinking fountains
Fulmore MSRenovate student and faculty restrooms
Kealing MSConstruct direct exitway from cafeteria
Kealing MSConstruct direct exitway from science classrooms 109A & B
McCallum HSRenovate student and faculty restrooms
Reagan HSInstall additional exterior security lighting at south parking lot
St. Elmo ESConstruct additional set of student and faculty restrooms
Sims ESExtend/replace security fencing at main entry
Small MSInstall additional exterior security and stairway lighting
Small MSConstruct enclosure for three-story exterior stairway
Webb MSInstall ADA-compliant elevator
Zilker ESRenovate group student restrooms for ADA compliance, install wheelchair lift at stage, and make modifications to accessible route to student pick up area
TOTAL $5,586,002

INDOOR AIR QUALITY/HEATING, VENTILATION and AIR-CONDITIONING (HVAC) SYSTEMS

Anderson HSReplace selected HVAC system equipment
Andrews ESReplace HVAC system equipment in administration area
Ann Richards School for Young Women LeadersReplace selected HVAC system equipment in two-story classroom wing
Bailey MSReplace HVAC system equipment at cafeteria, gymnasium and administration area
Baker CenterReplace selected HVAC system equipment
Becker ESReplace HVAC system equipment at cafeteria and gymnasium, and install new digital controls
Boone ESReplace HVAC system equipment at cafeteria, gymnasium, library, and selected classrooms
Bowie HSInstall digital HVAC controls to replace deteriorated pneumatic systems
Brentwood ESReplace HVAC system equipment in the administration area
Brooke ESReplace HVAC system equipment at cafeteria and 100-classroom wing, and install new digital controls
Brown ESReplace HVAC system equipment at library
Burnet MSReplace HVAC system cooling tower
Clifton CenterReplace selected HVAC system equipment
Covington MSReplace HVAC system equipment at large gym, career education building, and computer lab
Dawson ESReplace HVAC system equipment at cafeteria and library, and provide digital controls
Dobie MSReplace HVAC system equipment at band hall and orchestra room
Doss ESReplace HVAC system equipment at 300-classroom wing
Garza HSReplace HVAC system cooling tower and heat exchanger
Govalle ESReplace HVAC system equipment at kitchen, cafeteria, and 200 & 500-classroom wings
Johnston HSReplace HVAC system at large gymnasium
Jordan ESReplace HVAC system equipment at kitchen, and install new digital controls
Kiker ESInstall supplemental conditioned fresh air system at classroom wings
Lanier HS Replace HVAC system equipment at agriculture building
LBJ HSReplace HVAC system equipment at gymnasium
McCallum HSReplace HVAC system equipment at math classroom wing
Mendez MSReplace HVAC system equipment at cafeteria
Norman ESReplace central HVAC system chilling plant
Oak Hill Anx ESReplace selected HVAC system equipment at administration area
Oak Hill ESReplace selected HVAC system equipment at cafeteria and gymnasium
Ortega ESReplace HVAC system equipment at administration area, and install digital controls
Pecan Springs ESReplace HVAC system equipment at administration area, and install digital controls
Pleasant Hill ESReplace HVAC system equipment at kitchen
Read ESReplace HVAC system equipment at selected classrooms, and replace one boiler
Reagan HSReplace HVAC system equipment at gymnasium buildings
St. Elmo ESReplace HVAC system equipment at cafeteria
Summitt ESReplace HVAC system equipment at cafeteria, gymnasium and kitchen
Travis Heights ESReplace HVAC system equipment at gymnasium
Travis Heights ESReplace HVAC system equipment at cafeteria
Williams ESReplace HVAC system equipment at kitchen
Williams ESReplace one HVAC system chiller
Zilker ESReplace HVAC system equipment at library
TOTAL $20,391,325

Back to top

ROOFING

Austin HSRepair/replace roofing at 200-classroom wing, gymnasium and weight room
Barton Hills ESRepair/replace roofing over classroom areas
Blackshear ESConstruct canopy at southwest corner entry
Brown ESRepair/replace roofing at 300-classroom wing, gymnasium and kitchen corridors and library
Burnet MSRepair/replace roofing at 400-classroom wing, administration area and gymnasium dressing areas
Highland Pk. ESRepair/replace roofing at 100 & 300-classroom wings, main corridor and administration area, kitchen, loading dock, and mechanical room
Johnston HSRepair/replace roofing at classrooms 702-713, health services, print shop, culinary arts, and other selected areas
Reilly ESReplace roofing and roof deck above kitchen and food preparation area
St. Elmo ESRepair/replace roofing at 100 & 300-classroom wings and gymnasium
TOTAL $4,458,073

BUILDING ENVELOPE

Barton Hills ESReplace deteriorated doors and frames at gymnasium
Brentwood ESReplace windows at 300-classroom wing
Cunningham ESReplace courtyard windows
Highland Pk. ESReplace windows at administration area
McCallum HSReplace courtyard windows at main corridor
Pearce MSRepair/replace exterior wall cladding and weatherproofing flashing
Kealing MSConstruct direct exitway from science classrooms 109A & B
Reilly ESReplace windows at cafeteria
Reilly ESReplace windows at 400-classroom wing
Travis HSReplace windows at 100 & 200-classroom wings, and reglaze windows at two-story 600-classroom wing
TOTAL $2,910,189

Back to top

SITE IMPROVEMENTS

Allan ESReplace sanitary sewer line at Annex
Anderson HSConstruct four additional tennis courts
Barton Hills ESImprove site drainage at front of building and at portables
Casis ES Improve site drainage at front courtyard and on south side of school
Fulmore MSReplace sanitary sewer line at 500-classroom wing
Highland Pk. ESInstall security fencing between building wings
Joslin ESInstall security fencing between library and 100-classroom wing
Pearce MSImprove roof downspout and site drainage
Reilly ESConstruct canopy for student pick-up
Reilly ESImprove site drainage at front of school
TOTAL $1,713,905

FUNCTIONAL INTERIOR IMPROVEMENTS

Allan ESReplace tile flooring at entry
Austin HSReplace bleachers
Burnet MSReplace bleachers
Davis ESReplace moveable partition between cafeteria and gymnasium
Dobie MSReplace bleachers
Doss ESInstall locking system for doors to classroom areas
Mathews ESConstruct built-in storage units for selected classrooms
McCallum HSReplace deteriorated lockers along main corridor
McCallum HSReplace bleachers
McCallum HSReplace theater fly system at stage
Mendez MSReplace bleachers
Mills ESRenovate administration area for required visitor entry and replace entry canopy
Travis HSReplace bleachers
TOTAL $1,835,075

Back to top

FIXED EQUIPMENT

Crockett HSPurchase automotive/collision equipment for Automotive Career Center
TOTAL $318,500


GRAND TOTAL CRITICAL RENOVATIONS $37,213,068